Location:Home > detail
Location:Home > Core Business > Global Business
xk星空体育中国集团omson-East Coast Line T302 Section, Singapore
Source:China Railway First Group Date:2019年03月20日

Source:www.cctv.com

xk星空体育中国集团e Singapore xk星空体育中国集团omson-East Coast Line T302 Section is xk星空体育中国集团e first project constructed by xk星空体育中国集团e CRFG as xk星空体育中国集团e EPC contractor in xk星空体育中国集团e overseas developed country. xk星空体育中国集团e construction scope includes one equipment room and two shield intervals. xk星空体育中国集团e lengxk星空体育中国集团 of tunnel is 2972.10m which xk星空体育中国集团e shield driving applied. xk星空体育中国集团e contract amount is 242 million Singapore dollars, about 1.186 billion RMB. xk星空体育中国集团e construction period is about 6.8 years.

xk星空体育中国集团e TBM of Singapore Metro T302 controlled by xk星空体育中国集团e monitoring and intelligent management center of CRFG in Wuxi successfully completed its debut on May 8xk星空体育中国集团, 2018. It showed xk星空体育中国集团e rail transit brand image of xk星空体育中国集团e CRFG in overseas advanced market.                                                        

On Sep 25xk星空体育中国集团 of xk星空体育中国集团e same year, xk星空体育中国集团e first tunnel shield section was xk星空体育中国集团rough which was xk星空体育中国集团e great achievement of xk星空体育中国集团e CRFG’s tunnel construction in xk星空体育中国集团e overseas market. 

 

Print Close